07 March 2015

Frame up, rain down


Sorry to keep everyone waiting. There is a lot of catch up to do in this blog. Michael and I have not been well in the last two weeks, just could not get rid of the cold.

22nd February 2015 

Cyclone Marcia did not slow down our building process. We were very luck, we did not get heavy storm or strong wind in Brisbane, we only got heavy rains every now and then.


But we are still very nervous, as Plantation had told us they had started the frame stage on the 16th February 2015 and should be completed by the 3rd March 2015. We are not sure if the weather will affect our construction site or causing any delay. We went up on the weekend to make sure everything is still alright. Surprisingly, there is quiet a lot had been done since our last visit (7 days ago). We are really happy about the progress of the building and the communication has been fantastic so far.   

Ground floor frames were up. Apologize for my finger in front of the camera. 

More frames to go up in the garage area.
Secondary street view of the house. Left of the tree is laundry and right is the kitchen and family room.  

Peeking into the laundry, on the right is the build in wardrobe. 
Family room area
Another view of the family room and backyard.
Looks like we got some heavy rain washing off the soil on the side of the house.

2 comments:

  1. That all looks so exciting! Great to know where and how the water runs off too!

    ReplyDelete